DESIGNING IS OUR GAME
DESIGNING IS OUR GAME
The order included modernization of the belt carriage PVZ 2500 – 45/27. The machine is placed in the Bílina Mines (Doly Bílina) under operation number 81. The modernization scope included the following parts of the machine.
When certain conditions of the mining technology are met, the conveyor carriage PVZ 2500-45/27 can be used:
The conveyor carriage is usually used for distribution or routing of conveyance of coal or overburden in the belt conveyance system. The purpose of the conveyor carriage reconstruction was to increase reliability of the equipment and at the same time to decrease requirements for attendance and maintenance.
Nominal conveying capacity | 2,500 | m3.hod-1 | ||
Material to be conveyed – specific design weight of excavated material | Max. 1,600 | kg.m-3 | ||
Conveying distance | 72 | m | ||
Speed of travel | 360 | m.hod-1 | ||
Medium specific pressure | 0.085 | MPa | ||
Loading boom: | – belt width | 1,200 | mm | |
– belt speed | 4 | m.s-1 | ||
– boom length | 27 | m | ||
Unloading boom: | – belt width | 1,200 | mm | |
– belt speed | 5 | m.s-1 | ||
– boom length | 45 | m | ||
Range of slewing: | – loading boom on ground | ± 9° | ||
– loading boom suspended | ± 18° | |||
Slewing speed of unloading boom end | 13.7 | m.min-1 | ||
Pitch of loading boom | 16° | |||
Pitch of unloading boom | – upward | +15° | ||
– downward | -8° | |||
Height of discharge chute of unloading boom | – maximum | 17 | m | |
Pitch during conveying – boom in direction of travel | 1:6 | |||
Pitch during work in direction of travel: | 1:20 | |||
Inclination during work in transverse direction to travel | 1:20 | |||
Total machine weight | 297 | t | ||
Installed power in total | 650 | kW | ||