REPLACEMENT OF OIL TRANSFORMERS - NOEN, a.s.

General description

The reconstruction aim is modification of transformer cubicles in order that fire-safer dry transformers can be used.

Scope of reconstruction

MECHANICAL PART

  • Modification of a floor in the PV transformer station
  • Modification of a walkway in the PV transformer station
  • A front wall of the PV transformer cubicle
  • A roof above air-conditioning units

ELECTRICAL PART

  • Removal of 35 kV oil transformers
  • Erection, positioning and screwing-in of 35 kV air transformers
  • Erection of external and internal Toshiba air-conditioning units
  • Mounting and connection of the air-conditioning unit transformer in the switching station RM15 to PV